Iranian Classification Society Rules

< Previous | Contents | Next >

<ANNEX>

Annex Annex Annex Annex Annex Annex Annex Annex Annex Annex Annex


1-1

1-2

1-3

1-4

1-5

1-6

1-7

1-8

1-9

1-10

1-11


Character of Classification Intact Stability

Example of the Survey Programme and the Survey Planning Questionnaire Owners Inspection Report

Thickness Measurement Method for Hull Structural Members Areas of Close-up Survey, etc.

Continuous Machinery Survey Procedure(CMS)

Planned Maintenance System Procedure(PMS)

Guidance for Survey of Waterjet Propulsion Systems and Azimuth or Rotatable Thruster Loading Instrument on Stability

Procedural Requirements for Service Suppliers


26 Introduction to the Classification Technical Rules 2015

CONTENTS OF CLASSIFICATION TECHNICAL RULES

image


Annex 1-12

Annex 1-13

Annex 1-14

Annex 1-15

Hull Survey for Classification Survey during Construction Owner's Hull Inspection and Maintenance Program

Examples of Typical Bow, Inner, Side Shell and Stern Doors Requirements for CLEAN Notation


Introduction to the Classification Technical Rules 2015 27

image

CONTENTS OF CLASSIFICATION TECHNICAL RULES