Iranian Classification Society Rules

< Previous | Contents | Next >

Section 1 G


101. General


1. This Guidance prescribes plans to be submitted and systems to be installed. The design and in- stallation of structures and systems are to be in accordance with applicable requirements in Guidance for Gas-fuelled Ships.


2. Drawing approval and survey for LNG fuel ready are not accepted as Drawing approval and survey for conversion to gas fuel ship. When the ship is converted, drawing approval and survey are to be carried out in accordance with Guidance for Gas-fuelled Ships in force at the time of the ship conversion. Approved Drawings and certifications from new building stage may be used as refer- ence for conversion.