Iranian Classification Society Rules

< Previous | Contents | Next >

Section 1 General


102. Approval and Manufacturing Control


1. Approval

(1) FRP ships applied for survey during construction are to be moulded at the workshop approved by Society in accordance with Ch 2, Sec 13 of Guidance for Approval of Manufacturing Process and Type Approval, Etc.

(2) FRP materials (fibre reinforcement, resigns and core, etc.) used for FRP ships applied for survey during construction are to be appropriate to Pt 2, Annex 2-8 of Rules for the Classification

of Steel Ships and are to be accordance with Ch 3, Sec 28 of Guidance for Approval of

Manufacturing Process and Type Approval, etc.