Iranian Classification Society Rules

< Previous | Contents | Next >

Section 3 Classification Survey after Construction


301. General


1. In the classification survey after construction of FRP ships, the actual scantlings of main parts of the ship are to be measured in addition to such examinations of the hull and machinery, equipment and structure, material, manufacture and condition of fixtures as required for the special survey cor- responding to the ship's age. And the FRP ships are to be assigned load line as deemed necessary.


2. As for FRP ships documents required


intended for the classification survey specified in the preceding 1, plans and for the classification survey during construction are to be submitted. image

image