< Previous | Contents | Next >
Section 5 Documents and Drawings for Approval
501. General
Before commencement of fabrication, plans and other documentation giving the required particulars are to be submitted in triplicate.
502. Drawings and documents
The following drawings and documents are to be submitted :
(1)
(2)
(3)
(4)
General arrangement Cross sectional assembly Details of welding joints
Details of Propulsion and maneuvering equipment
28 Guidance Relating to the Rules for the Classification of Underwater Vehicles 2015
Pt 2 Underwater Equipments
Ch 1 Remote-Operated Vehicles (ROVs) Pt 2, Ch 1
(5)
(6)
(7)
(8)
(9)
Construction of Pressure vessel and High pressure pipes Electric, hydraulic and mechanical equipment system Thrust arrangement
Robot-arm expansion
Details of umbilical and tether
(10) Details of piping, valves, equipments
(11) Buoyancy and stability arrangements
(12) Other drawings when necessary
(13) Diagram with sequence of control and operating function.
(14) Procedure of supply of electric, hydraulic and pneumatic.
(15) Enclosed grade of all electric equipments
(16) Supporting structures, contact, materials.
(17) Electrical power supply system
(18) Details of motor and battery
(19) Specification of valves, hoses and pipes
(20) Load calculation ( load, shearforce, and moment for construction )
(21) Calculation and data for trim and ballasting
(22) Operation manual and maintenance