< Previous | Contents | Next >

Section 3 Classification Survey after Construction


301. Classification survey after construction

In the Classification Survey after Construction, the actual scantlings of main parts of the diving systems are to be measured in addition to such examinations of the construction, materials, work- manship and actual conditions of structure, machinery, outfittings, and equipment.


302. Submission of plans

In the Classification Survey after Construction, plans and documents as may be required for Classification Survey during Construction are to be submitted. If plans cannot be obtained, facilities are to be given for the Society's surveyor to take the necessary informations from the diving system.


303. Classification survey of submersibles classed by other classes

When a submersible classed with any of IACS Member Societies is intended for classification, plans and documents to be submitted and survey status, etc., are to be complied with as provided separately.


304. Tests

In the Classification Survey after Construction, the hydraulic pressure tests, watertight tests and per- formance tests are to be carried out in accordance with the requirements of the Rules. However, these tests may be dispensed with, provided that sufficient data on the previous tests are available.

image

Pt 1 Submersibles

Ch 3 Periodical and Other Survey Pt 1, Ch 3

image