Iranian Classification Society Rules

< Previous | Contents | Next >

Section 2 Classification Survey During Construction


201. General

A detailed survey is to be done for structures, materials, dimensions and works of the hull, machi- nery, equipment and articles at the time of the classification survey during construction and confirm whether or not the applicable requirements of each Chapter is complied with and for the dredger that needs the marking of the load lines, the assignment of the load lines is to be done.


202. Documents to be submitted


1. For a dredger requiring classification survey during construction, the following drawings and other documents are to be submitted and approved by this Society.

(1) Hull parts

General arrangement

Midship section

Construction profile

Deck construction

Superstructure and deckhouse construction

Shell expansion

Single and double bottom construction

Watertight bulkhead

Fore peak tank and aft peak tank construction

Transverse section

Frame structure

Details of the watertight doors, hatch openings and their arrangements and closing appliances

Hopper(bottom opening type hold) structure

Boiler foundation, Main engine foundation, thruster and intermediate shaft foundations, Generator seat and other essential auxiliary seats

Dredging equipment and foundations

Mooring and towing equipment

Steering and anchoring arrangement

Welding specification

Fire protection and fire fighting plan

Other drawings and documents as deemed necessary by this Society

(2) Machinery parts

General arrangement of dredging equipment, power transmission system, diagram of dredging equipment and operating system

Drawings and documents of main engines, auxiliary engines, pump and piping systems

Other drawings and documents as deemed necessary by this Society

2. For a dredger requiring classification survey during construction, the following drawings and docu- ments in addition to those mentioned in the Par 1 are to be submitted to this society.

(1) Specification

(2) Calculation sheet of the loads which are from dredging equipment and other installations to the supporting structure

(3) Tugging instructions

image

Ch 2


(4) Tank capacity plan and sounding tables

(5) In a dredger which is intended to get load line assignment, the drawings mentioned in to

and in Par 1, and the following drawings:

Lines

Hydrostatic curves

(6) Machinery particulars

(7) Torsional vibration calculation sheet for driven shaft of generator of 30 kw and more

(8) Capacity calculation sheet of battery for navigation lights

(9) Light weight distribution chart

(10) Location, mass and limit condition of various mobile dredging equipment according to each load condition

(11) Shear force and bending moment calculation sheet according to each load condition

(12) Calculation sheet of the horizontal forces taken to suction pipes and gallow

(13) Other drawings and documents as deemed necessary by this Society