Section 2 Definitions
201. Application
1. The definitions of terms and symbols which appear in the Guidance are to be as specified in this Section, unless otherwise specified, and definitions of terms and symbols not specified in the Guidance are to be as specified in Rules for Pt.7, Ch.5 of the Classification of Steel Ships and Guidance for Floating Production Units.
202. Definitions
1. Process system is the system that treats and liquefies produced gas from the well and generally composed of the treatment equipment for acid gas(sulphur compounds, carbonic acid, etc.) removal, dehydration and mercury removal from raw gas and liquefaction equipment of treated gas.
2. Regasification systems is the system that convert the liquefied gas into vapor to transfer the gas ashore.
3. Loading system is the system that transfer the liquefied gas to the storage tanks of units and is considered to include the loading arms or cryogenic hoses and piping systems up to inlet flange on the storage tanks.
4. Offloading system is the system that transfer a liquefied gas from the storage tanks of units to liquefied gas ships and is considered to include cargo pumps, gas compressors, the piping system up to cargo manifold and loading arms or cryogenic hoses.
5. Import system is the
riser that transfers the produced gas form well to the process systems in
units and is considered to include connections to the pipe line end manifold and connection to the first flange in the unit.
6. Export system is the
riser that transfers vaporized gas from units to shore and is considered to
include the connectin to the last flange manifold.
in the unit and the connection to the pipe line end
2 Guidance for Floating Liquefied Gas Unit 2015
7. Riser is a subsea rigid or flexible pipe that connects the surface facilities with the sea floor and conveys produced gas or vaporized gas.
8. Approval on risk-based design refers to review and approve the units on which innovative
novel design or risk-based design has been applied. Approval
Guidance for Approval of Risk-based Ship Design.
process may apply process defied in