< Previous | Contents | Next >
SECTION 9 Prime Mover
901. Internal Combustion Engines
1. Engines and their installations are to be in accordance with NFPA Std. No. 37.
2. The recommended service applications together with curves showing the recommended maximum
standard brake horsepower within the recommended speed range for each service are to submitted.
3. Testing is to be performed under an approved quality assurance program or in the presence of Surveyor.
be
the
902. Electrical prime mover
1. All rotating machines (if any) 100 kW and above are to be of drawing approval and tested in presence of and inspected by the Surveyor at the plant of the manufacturer.
2. For machines of less than 100 kW, the tests may be carried out by the manufacturer under the tendance of the Surveyor and whose certificate of tests may be acceptable.
the at-
Guidance Relating to the Rules for the Classification of Mobile Offshore Drilling Units 2015 63