< Previous | Contents | Next >
storage spaces below 10
m2 or equipment using only fuel with flashpoint above 60 C.
103. Plans and documents
1. For a yacht requiring Classification Survey during Construction, three copies of the plans and one copy of documents are to be submitted and approved before the work is commenced.
(1) Fire control plan
(2) Fixed fire fighting system
(3) Fire detection and TV monitoring system
(4) Other plans and documents specified by the Society.